Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658163

- Product Categories
- Friendly Links
- home > Supply > Xuzhou air conditioning maintenance shift, air conditioning maintenance, refrigeration Sheng Erda
Information Name: | Xuzhou air conditioning maintenance shift, air conditioning maintenance, refrigeration Sheng Erda |
Published: | 2015-03-09 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Xuzhou Sheng Erda Refrigeration Electrical Services Ltd fluoride tube air exclusion: Open the bottle a little fluoride Xuzhou hand air conditioning recovery phone, so the bottle inside fluorine, fluorine gas slowly out about 5 seconds. Then fluorine fast connection pipe on air conditioning and fluoride mouth, to tighten Xuzhou Hitachi central air conditioning installation telephone, air such fluorine tube came out Xuzhou hand air conditioning repair, air conditioning in the flow is fluoride. (Emptying the bottle when not open too much fluoride, outlet to become, and fluoride to maximum) Xuzhou 圣尔达 Refrigeration Electrical Services Limited II. When installed there to open the valve emptying: as follows: after the internal and external machine fixed, 1. Air conditioning is good, mainly to connect the inner and outer tubes are tight, pay attention to certain connected, to prevent refrigerant leaks. 2. Allen hit the autopilot switch on the air conditioning to work to open the high-pressure valve (thin tube valves), with hexagonal withstand fluoride mouth thimble (fluoride mouth on the low pressure), so that the inside of the gas ran out, 10 seconds bell about it, do not wait too long, so much snow species run. So you can make the air inside the pipe to put out. 4. Then the high and low pressure valves are open, both inside and outside the machine's power cord is connected to it. Note: The connecting pipe is copper, not the disk into a dead corner, otherwise it will affect the flow of refrigerant can cause cooling and heating. Demolition when the first harvest of fluorine, otherwise it will cause leakage of fluorine. Xuzhou air conditioning maintenance shift, air conditioning maintenance, refrigeration provided by Xuzhou Sheng Erda 圣尔达 Refrigeration Electrical Services Limited. Xuzhou 圣尔达 Refrigeration Electrical Services Limited (xzktw.com) strong, credible, in Xuzhou heat exchangers, refrigeration and air conditioning equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Sheng Erda refrigeration and you hand into the brilliant, for a better future! |
Admin>>>
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility