Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658163

- Product Categories
- Friendly Links
- home > Supply > Xuzhou hand air conditioning installation, second-hand air-conditioning, refrigeration Sheng Erda
Information Name: | Xuzhou hand air conditioning installation, second-hand air-conditioning, refrigeration Sheng Erda |
Published: | 2015-03-23 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Environmental conditioning maintenance cleaning methods 1. Clean the filter removed evaporation method filters with high-pressure water rinse, wash as usual that is able to clean. If the filter is difficult to wash the material online, to use high-pressure water wash evaporation tank filter and air conditioners, air conditioning and then further filter online spray washing liquid, washing liquid to be completely soaked filter after 5 minutes, and then used high-pressure water wash Xuzhou central air conditioning, Internet filtering impurities until after leaving the can. 22. After the removal of environmental air conditioners taint long run, if no air conditioner tune usually hold good washing recuperation, probably caused by air conditioners cool sent smell, then just press a step to clean the filter and environmental Air conditioning can sink. If the odor is still available in the boot of the environment, to the sink to add some chlorine disinfectant, disinfectant enrich let soak over every corner of the screen and cold machine, disinfecting frequently repeated behavior can smell air-conditioners. 33. Winter environmental conditioning maintenance methods used to enter the winter air conditioning, if your air conditioner is no longer used by the winter, when demand for air conditioners to hold simple maintenance to restore things. First air conditioner water valve closed, remove the filter, in accordance with the clean "evaporation filter," while water tank drain water, thoroughly clean air conditioners sink (careful, do not let the water flow to the motor above) Xuzhou hand wedding dresses conditional can hold a comprehensive disinfection. After the washing is complete, replace the filter. At this machine blowing 5-8 minutes, until dry filter, closed air conditioners total power supply. Wedding dresses steps: First, the preparatory work at least two or more persons skilled refrigeration repairman, tool set, seat belts and other safety equipment. Two steps disassemble 1 Recovery of refrigerant whether it is winter or summer dresses Xuzhou hand air conditioning installation, air conditioners must be collected refrigerant to the outdoor unit. Should start before disassemble the empty withered, remote set cooling, refrigeration compressor operation status to be normal, with the wrench outside the machine liquid pipe and gas pipe protection cap on the interface, turn off the high-pressure pipe (fine) The cut-off valve, l min (bigger air conditioning on the other about 2 minutes) after the appearance of condensation tube, immediately turn off the low-pressure pipe (crude) cutoff valves, with the rapid shutdown, unplug the power cord, use a wrench to tighten the insurance cap, so far refrigerant recovery work is completed. 2. After the demolition of interior mechanism of refrigerant recovery, removable indoor unit. The indoor unit is connected with a wrench to unscrew the lock master, ready sealed with sodium child spin cover your indoor unit connectors wire lines, prevent joint damage the wire pattern in delivery; then cross from the Line of Control. At the same time should be marked to avoid the wrong during installation. If the signal lines or power lines are wrong, it will cause outside the machine is not running, or uncontrolled machine. The machine is generally fixed peg board is strong, unloading more difficult; emptied remove siding, then gently pat into flat concrete floor flat correction. 3. Demolition of the outdoor unit split outdoor unit by professional refrigeration repairman demolished in ensuring safety. Connect twist lock away his mother, live in a prepared application sealed sodium child spin care out connectors for wire lines. Loosen the screws with a wrench outside the machine at the end of the foot. After the demolition of the outdoor unit down, preferably with rope Diaozhu unloading put balance should pay attention to avoid vibration, bump, and note the downstairs cars and people. Xuzhou hand air conditioning installation, second-hand air-conditioning, refrigeration provided by Xuzhou Sheng Erda 圣尔达 Refrigeration Electrical Services Limited. Xuzhou 圣尔达 Refrigeration Electrical Services Limited (xzktw.com) strong, credible, in Xuzhou heat exchangers, refrigeration and air conditioning equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Sheng Erda refrigeration and you hand into the brilliant, for a better future! |
Admin>>>
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility