Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658163

- Product Categories
- Friendly Links
- home > Supply > Xuzhou used central air conditioning recycling | Sheng Erda refrigeration (certified) | Central Air Conditioning
Xuzhou used central air conditioning recycling | Sheng Erda refrigeration (certified) | Central Air Conditioning
Information Name: | Xuzhou used central air conditioning recycling | Sheng Erda refrigeration (certified) | Central Air Conditioning |
Published: | 2015-04-22 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Cleaning the indoor unit - cleaning venetian blinds panel panel cleaning (only for VV, YV split wall unit) 1. Disconnect the power, unplug it. 2. Using both hands, grasp the panel blinds, horizontal lift and hold the hinged department pulled forward. Note: (1) Do not force the panel drawn blinds, panel blinds do not fall to the ground, so as to avoid the panel damage. (2) Do not stand unsteady table removable louvered panels, or they may tip over injuries. 3. Wipe with a soft cloth or washed, washed clean and dry with a soft cloth. Note: (1) remain in the water should be the opposite of the display unit with a soft, dry cloth. (2) stubborn stains with a soft cloth dipped in a neutral detergent. (3) Do not use gasoline, naphtha, solvent mixture, rubbing powder, disinfectant and detergent, do not wash with a brush or scouring pad contact surfaces like hard tool. (4) Do not for a long time (more than two hours) placed in direct sunlight and heating hot water or placed in scope, otherwise it will cause the front panel deformation and discoloration. Louver panel installation (for VV, YV split wall machines only) 1. Hold both ends of the louver panel with both hands, so that the panel louvers horizontal position. 2. The indoor unit hinge portion into the uppermost slot. (Insert clasp around until you hear the "click" is heard) 3. Using both hands, both ends of the louver panel and close the blinds panel. 4. Press the three parts and then hand the figure represented louver panel installed. E1 Gree air conditioning fault repair method is to first determine the period of operation failure or power-on fails to distinguish between a system failure or circuit fault Xuzhou home central air conditioning maintenance, systems major considerations: 1> emptying dirty / new installations 2> excessive overshoot Notes / repaired 3> machine outside temperature / poor ventilation? Fouling? Harsh environment? Circuit: the short board within ovc with the zero line, if they continue to fail, bad motherboard / exchange, repair, if not failure, check whether the high-pressure switch is turned |
Admin>>>
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility