Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658163

- Product Categories
- Friendly Links
- home > Supply > Sheng Erda cooling (Figure), Xuzhou Hisense air conditioning maintenance of telephone, air conditioning
Sheng Erda cooling (Figure), Xuzhou Hisense air conditioning maintenance of telephone, air conditioning
Information Name: | Sheng Erda cooling (Figure), Xuzhou Hisense air conditioning maintenance of telephone, air conditioning |
Published: | 2015-05-05 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Air conditioning position different cleaning methods of the different air cleaning and major attention to several parts: parts one: split air: indoor vertical face cover and filter machine, indoor machine host or stand, should face cover and filter for the main cleaning parts. Savings within the air conditioner filter dust down very much, not only detrimental to the human body, but also impede the flow of air and reduce the cooling effect. A winter without the use of air conditioning, but also makes it easy for air conditioning in the left moldy material, so before use, be sure to clean the filter. Methods for cleaning up: Cover --- if not more oil, rinse with water, with a clean soft bristle brush to clean. Xuzhou during use hand air conditioning recovery, in order to ensure clean air, should be cleaned once every 15 days. Filter --- with plenty of clean water after dry, and then put back. Use the air conditioner, in order to ensure clean air, should be cleaned every 15 days. Note: When long without air conditioning, ventilation and air conditioning unit still guarantee shall be every 1-2 months hair file ventilation opening. Three parts: split air: outdoor unit housing the outdoor unit is mainly from the cooling effect, the outdoor air is circulated through it to exchange some place near the mouth of the outdoor unit fumes may also adsorb a lot of smoke, these are factors that impede the fresh air. Methods for cleaning up: outdoor unit residential users generally rinse with water, if heavy fumes or by the roadside of the outdoor unit, need professional cleaning solution before cleaning in place. Four parts: outdoor drains, dust in the air into the air conditioning inside, after cooling, with the waste water into the sink, long-term accumulation of dust can clog drains, leaking air conditioner. Methods for cleaning up: Clean up here in general should be invited professionals, but also because some of the cell is designated a unified air-conditioning drainage outfall, once a problem, but not a simple can of governance. Air-conditioned building in the summer rely refrigerator indoor heat loads moved outdoors. Clearly, reducing the indoor heat load, reducing the running time of the refrigerator, central air-conditioning system energy consumption is reduced. Indoor thermal load from two aspects, one is the heat caused by the indoor and outdoor temperature exchange, on the other hand is the heat load generated by indoor lighting and equipment. Therefore, you can take the sun, air tightness, insulation and other measures to reduce indoor heat load to save energy. Reduce indoor heat load (1) reducing direct sun radiation sun roof, walls, windows and through the window into the room, can be cornice, visor (canopy), coated glass; reduce the external walls, roof absorb solar radiation heat , can be light-colored exterior finishes, heat-insulating layer is provided on the outside walls and roof roof, roofing or overhead. Increase external shading for summer cooling load (or cooling capacity) to reduce very significantly. According to the China Academy of Building Research determination whitewashed cement roof, the roof surface temperature in summer can be reduced 16-19 ℃. (2) improve airtight airtight doors and windows, to prevent the gap into the wind. Use airtight plastic doors and windows not only good, but great resistance, and reduce noise Xuzhou Oakes air conditioning maintenance, reducing dust. Or the use of doors and windows sealed, airtight doors and windows to improve. Room air changes from 8 to 5 times, the consumption can be reduced by cooling the buildings around 8%. Therefore, the design should be used in well sealed doors and windows. Plus set up a closed bar is an important means to improve the air tightness of windows and doors. Depending on the circumstances of windows and doors, were different seal. Such as rubber, plastic or rubber strip binding seal. (3) the use of insulation materials for thermal insulation walls, roofs, doors, windows, etc. insulation, such as rock wool, slag wool, glass wool, polystyrene foam, expanded perlite, aerated concrete, rigid polyurethane foam, PVC plastic doors and windows hollow glass and other second-hand air conditioning Xuzhou transfer, in order to reduce the heat transfer coefficient of building envelope. Hollow brick, two-story windows, etc., the use of air insulation, thermal insulation may also play a role. Additional external walls and roof insulation for winter and summer energy-saving benefit. Shenger Da cooling (Figure), Xuzhou Hisense air conditioning maintenance of telephone, air conditioning provided by Xuzhou 圣尔达 Refrigeration Electrical Services Limited. Xuzhou Sheng Erda Refrigeration Electrical Services Limited (xzktw.com) is a professional, "Gree multi-line, large cooling towers, Hitachi absorption chillers" company. Since its inception, we adhere to the "good faith, sound management" approach, the courage of healthy competition in the market, so that the "Gree, Daikin" brand has a good reputation. We adhere to the "service first, customer first" principle, so 圣尔达 refrigeration won the trust of customers in all heat, refrigeration and air conditioning equipment, and establish a good corporate image. Special Note: This information is for reference only pictures and information, please contact us to obtain the most accurate information, thank you! |
Admin>>>
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25475 visitor
Copyright © GuangDong ICP No. 10089450, Xuzhou Sheng Erda Refrigeration Electrical Services Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility